Recent Blogs Posts

*

  1. Almost done trimming En Provence

    by , 01-18-2017 at 11:22 AM
    I've finished trimming weeks 2 through 7 blocks while week 1 still hangs on the mannequin. If I can finish trimming today, perhaps I'll be able to make a design block before the week is out. And another plus, after learning I don't count so well, and had to make a few more week 2, 6, and 7, I now have an ample amount to do the entire quilt with 3 extra squares. Add to that the fact that I had nearly perfect tri recs from week 2. At some point I must have redone them but with all that's happened ...
  2. Slow but steady, not that it's a race

    by , 01-15-2017 at 04:50 PM
    First I had to take everything off the mannequin, one step at a time.

    Name:  week 7 progress g.jpg
Views: 433
Size:  41.3 KB

    I've been busy cutting my squares down to size before beginning the task of piecing them all together. So far I've trimmed 195 squares. And this is the pile I have to show for it.

    Name:  Week 7 Trimmings a.jpg
Views: 453
Size:  42.6 KB

    Here's what I've completed so far:

    Name:  Week 7 Trimmings b.jpg
Views: 455
Size:  40.3 KB

    To see what others have done for the #enprovence ...

    Updated 01-15-2017 at 07:36 PM by ddtrina

    Categories
    Uncategorized
  3. Pictures of the final mannequin tree

    by , 01-08-2017 at 10:36 PM
    So today I started taking apart the mannequin "Christmas" tree but before I did I took lots of pictures. Now the process to cut the threads, trim the squares, and put it all together begins.

    Name:  week 7 progress a.jpg
Views: 921
Size:  50.0 KB Name:  week 7 progress b.jpg
Views: 920
Size:  51.5 KB Name:  week 7 progress c.jpg
Views: 926
Size:  49.2 KB Name:  week 7 progress d.jpg
Views: 922
Size:  48.0 KB Name:  week 7 progress e.jpg
Views: 922
Size:  43.0 KB Name:  week 7 progress f.jpg
Views: 921
Size:  39.6 KBName:  week 7 progress g.jpg
Views: 917
Size:  41.3 KB
  4. Week 7 Progress Bonnie Hunter En Provence Quilt

    by , 01-07-2017 at 09:51 PM
    Finished week 6 on Friday. Spent Friday evening and Saturday cutting and sewing the QSTs for week 7. Done all the small blocks. Now to put everything on a wall and begin the process of assembly all the blocks. Will take a final picture of my "tree" tomorrow before I take it all down to put on the wall.
  5. Less than a week since mom moved and I still haven't caught up

    by , 01-04-2017 at 06:18 PM
    So the junk man finally came 1 1/2 hours late last Friday and said he thought they wouldn't be able to take everything. I told him that's why I mentioned when I booked them that it was a 5 bedroom house that was to be completely cleaned out of whatever what not permanently attached to the structure. And that the realtor was due in the next day to take pictures of the house so it could be put on the market. 2 full truck loads later, the house was empty. And then yesterday the realtor calls me ...
  6. Mom's moved and I'm only 1 week behind

    by , 12-29-2016 at 05:32 PM
    What can I say after 54 years of memories in my parent's house? So glad all the moving worked out so well this week, mom is already settled into her new studio apartment with all the boxes unpacked and pictures on the wall. And after I meet the GOT Junk people tomorrow to take whatever remains out of her house, I'll be free to sew and catch up on week 5's clue. I figured out last night how to cut half square triangles from strips I already cut to 3 1/2 in size. But I haven't cut them yet for ...
  7. Week 5 Progress on En Provence

    by , 12-26-2016 at 06:16 AM
    My son is getting me an essential triangle tool so I'm trying to wait for that before doing anything else with my 3 1/2" strips. Once I get it, I'm sure it will take no time at all to make 64 half triangles.

    Name:  week 5 progress.jpg
Views: 1227
Size:  64.4 KB To see what other quilters have completed, click on the link below.

    Name:  enprovencelogo1.png
Views: 1255
Size:  20.0 KB

    Hope everyone had a safe and Merry Christmas/Hanukkah with their family/friends.

    Updated 12-26-2016 at 06:18 AM by ddtrina

    Categories
    Uncategorized
  8. What a quaundry I'm in

    by , 12-22-2016 at 08:19 PM
    I mistakenly cut all my neutrals for the En Provence quilt into 2 inch strips during my enthusiasm to complete week 1. So I went and bought more neutral fabric (1 piece only) to complete week 2. Lucky for me, I didn't need to go buy more neutral until week 4 so I bought the same print I got for week 2 rather than try to go scrappy like I did for week 1. Now that we are using neutral again, I find myself wondering if I should shop for more scrappy neutral material, use what's left from what I ...
  9. Done week 4 before midnight!

    by , 12-19-2016 at 05:59 AM
    Since my last post I've finished week 3, bought more neutral fabric and my backing fabric, and sewed all 80 triangle in a squares for week 4. I'm so much happier at how this group turned out, make me want to go back and look at what I did on my earlier attempts during week 2.

    Name:  week 4 progress.jpg
Views: 1414
Size:  42.1 KB

    And for a look at what other people have done this week for the Bonnie Hunter Mystery Quilt En-Provence check out this link:

    ...

    Updated 12-19-2016 at 06:12 AM by ddtrina

    Categories
    Uncategorized
  10. Done week 2 and halfway done week 3 - Mystery Quilt

    by , 12-14-2016 at 01:06 PM
    I just realized I hadn't posted my progress last week for the triangle in a square. And I'm halfway to being done for the purple 4 squares. Material is cut in strips and 2 long edges are sewn, just need to cut double strips to size and sew the next 80 squares together. The mannequin is getting a little busy.


    Name:  Week 2 progress.jpg
Views: 1327
Size:  41.1 KB Name:  Week 3 progress.jpg
Views: 1335
Size:  46.4 KB

    http://quiltville.blogspot.com/2016/...up-part-3.html
Page 1 of 2 1 2 LastLast

SEO by vBSEO ©2011, Crawlability, Inc.