Christmas Gifts
#21
So far, I've made a table runner, 2 dresden plate wall hangings, 2 carpenter square wall hangings, and now I'm working on a tree skirt. I have another table runner and 6 place mats to finish up. Tops are done, just need to sandwich, and finish the top stitching.
#22
Super Member
Join Date: Dec 2010
Location: Norfolk, VA
Posts: 5,397
I have many scheduled in my head it's getting them done that I'm not so sure about. Right now I'm working on doing Christmas ornaments and an angel tree topper; they are all created by making free standing lace on my embroidery machine. This weekend I'm starting on my daugther's tree skirt; it has embroidered blocks on it and each block will have one of the cars from the Christmas Circus Train and I'll put her, her fiancee, and her 2 kids names on it as well. I'd also like to do some towels up for them. I'm embroidering clock faces to put on pre-bought clocks as well. Oh, and I got some plain terry bibs and I'm going to put sayings on it for my granddaughter; one of which will be what she calls me; GiGi, you can't get those at the store. These are the things that I'm sure I'll get done and I won't go into all of the things that I want to get done.
#23
Super Member
Join Date: Feb 2011
Location: Yorkville, IL
Posts: 7,639
New quilts for my grandchildren..Gabi gets one with flowers and Zach gets one with the "CHICAGO Bull"..Just need to do the binding on hers and his is at the LAQer as of yesterday! I am working on a Christmas quilt for me but suspect it will be for Christmas 2012 or 2013!
#24
2 quilts that I have been working on since July... whew....
A red/white/blue log cabin for my Dad.
"Summer at Mom's" for my Mom. This one has over 50 pinwheels in it.... plus appliqued vines. Time intensive.
I had planned to have the quilt tops done by the end of October and get them quilted this month... running behind.
A red/white/blue log cabin for my Dad.
"Summer at Mom's" for my Mom. This one has over 50 pinwheels in it.... plus appliqued vines. Time intensive.
I had planned to have the quilt tops done by the end of October and get them quilted this month... running behind.
Thread
Thread Starter
Forum
Replies
Last Post
lynnie
General Chit-Chat (non-quilting talk)
15
02-18-2018 12:52 PM
craftybear
Recipes
9
10-02-2011 10:06 PM
craftybear
Links and Resources
4
12-17-2010 12:08 AM
craftybear
Main
239
10-31-2010 04:41 AM
charmpacksplus
Links and Resources
0
10-30-2010 01:24 PM