Go Back  Quiltingboard Forums > Main
Question for Long-Arm Quilters >

Question for Long-Arm Quilters

Question for Long-Arm Quilters

Old 08-27-2010, 07:13 AM
  #1  
Junior Member
Thread Starter
 
3699quilter's Avatar
 
Join Date: Mar 2010
Location: Michigan
Posts: 294
Default

Just wondering about the total time of quilting a quilt.
For instance, a twin size quilt with the same design throughout the quilt = a panograph I think they call it.

From the time you put it on your machine to the time you complete the quilting work - how long does it usually take?

If a person says they are quilting your quilt on Monday, baring any interruptions - would/should it be done the same day, at least the same week?
3699quilter is offline  
Old 08-27-2010, 07:29 AM
  #2  
Super Member
 
amandasgramma's Avatar
 
Join Date: May 2009
Location: La Pine Oregon, USA
Posts: 5,907
Default

I've not been longarming for long, but I did a Full-size quilt - in the meandering pattern, in just a few hours. I did it on the mid-arm -- which means that pattern size was smaller in width, so I had to roll the quilt 3 times more often than on the Longarms. That also included goofing off time! LOL I definately KNOW it should be done within the week. I'd think the quilter would want it OFF her machine.
amandasgramma is offline  
Old 08-27-2010, 07:31 AM
  #3  
Senior Member
 
jamh's Avatar
 
Join Date: Sep 2009
Location: cordele ga
Posts: 604
Default

I have a mid-arm!! And from start to finish! I'd say about 3 hours!! If it's a easy design, probably less time!!
jamh is offline  
Old 08-27-2010, 07:35 AM
  #4  
Super Member
 
hcarpanini's Avatar
 
Join Date: Jan 2010
Location: Indiana
Posts: 2,384
Default

I sometimes time myself, a pattern can take 8 minutes or 18 minutes per row, depending on the density. I try to do it in one day. I am not one to stand for hours at the machine. I do a row, laundry, row, coffee, row let the dogs out/in. and so on..... But I get the job done. There are advantages/disadvantages to being your own boss!
hcarpanini is offline  
Old 08-27-2010, 09:16 AM
  #5  
Senior Member
 
QuiltQtrs's Avatar
 
Join Date: Mar 2010
Location: NW Arkansas
Posts: 984
Default

Time to iron both top and backing: 20 minutes
Time to load top and back on quilting machine: 20 min.
Time to machine quilt with simple Pantograph or
overall free-hand Meander: Maximum 3 hours.
Time to trim all edges: 10 min.
This is what I figure using my Mid (Short)Arm machine
for Twin Size (approx. 64-72 wide up to 80" length)
Would charge $45-$50.
QuiltQtrs is offline  
Old 08-27-2010, 09:26 AM
  #6  
Power Poster
 
Join Date: Feb 2009
Location: Northern Michigan
Posts: 12,861
Default

anywhere from 2 hours to 200 hours. when i bought my long-arm the lady at the shop i ordered it through told me anyone can quilt a queen size quilt in 2 hours with this machine...10 years later i still have not managed that but i can do a baby quilt in 2 hours :)
it takes 45 minutes of more just to load the quilt; unloading does go a bit faster, but even baby quilts from the time i walk into the room to load till i unload and walk out is a minimum or 4 hours.
if the quilter works out side her quilting business (like me) i may load a quilt on sunday and get the first row across done, then stop. after work monday maybe go work another hour...ect so it may well take a week or two. it depends on lots of stuff...including dealing with tension issues, thread breaking problems, lots of stuff, so i don't think anyone can really say, i can quilt a quilt in 2 hours...maybe but not usually.
ckcowl is offline  
Old 08-27-2010, 10:48 AM
  #7  
Super Member
 
Join Date: Mar 2010
Location: North Carolina
Posts: 2,375
Default

Depends. You have to load/unload (which is a zillion pins for me) and then the density of the quilting, the design, if it has to be turned.

At the end of it all, they should have given you a "promised by" date...
Rebecca VLQ is offline  
Old 08-27-2010, 11:46 AM
  #8  
Senior Member
 
MamaHen's Avatar
 
Join Date: Apr 2009
Location: North Florida
Posts: 976
Default

I'd say one to two days for a good job. Loading correctly is important so this may take up to a hour or more. Correct tension is also important. This can take anywhere from 10 min to 30 depending. The all important quilting can be as quick or as labor instensive as one makes it. All depends on amount of quilting involved, all over free hand, panto, or show quality. I always say about a week, and feel good when I have it done in 3 days.
MamaHen is offline  
Old 08-27-2010, 11:49 AM
  #9  
Power Poster
 
Join Date: Oct 2009
Location: Idaho
Posts: 11,375
Default

To be fair: What did the long arm quilter tell you?
Sadiemae is offline  
Old 08-27-2010, 12:16 PM
  #10  
Super Member
 
wolph33's Avatar
 
Join Date: Jul 2010
Location: Wi
Posts: 9,232
Default

I have a long arm and doing a panto takes longer than free motion because you are trying to follow a line-but a twin could be loaded ,quilted and unloaded the same day if the panto is not very intricate.Even with problems and life,etc by the end of a week it should be done
wolph33 is offline  
Related Topics
Thread
Thread Starter
Forum
Replies
Last Post
mjpEncinitas
Links and Resources
26
11-28-2019 06:48 AM
Debapril
Main
8
11-20-2017 05:10 AM
dray965
Main
3
04-13-2013 06:36 AM
katier825
Main
9
04-25-2010 08:40 AM

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


FREE Quilting Newsletter