Welcome to the Quilting Board!

Already a member? Login above
loginabove
OR
To post questions, help other quilters and reduce advertising (like the one on your left), join our quilting community. It's free!

Page 3 of 10 FirstFirst ... 2 3 4 ... LastLast
Results 21 to 30 of 97

Thread: Row Robin 2012/2013 GROUP #6

  1. #21
    Member
    Join Date
    Apr 2010
    Location
    Raleigh, NC
    Posts
    46
    Maria's theme- Vibrant color with lots of movement with base fabric in Kaffe Fassett. I've only done one Kaffe quilt and it was a mysters. Had no idea how it would turn out but, I love it. It lives in my guest bedroom. Now I'd like one for me. I love pinks, reds, greens..... Don't particularly like matchy matchy so I integrate batiks with the Kaffe. I don't want to box anyone in on my rows... use your imagination and best judgement. I will love and treasure it.

  2. #22
    Senior Member Whigrose's Avatar
    Join Date
    Oct 2011
    Location
    Pine cone and tassel state
    Posts
    749
    Ah, all is good for Group 6 - everyone has 'signed on' so to say.

    So, what have you all been up to? I have been playing with a little 18" x24" 12-block applique sampler a quilting friend, unknowingly and innocently, sent my way by way of a link to another project she was asking input on. Right, you've all been there, right? Please tell me you get railroaded once in a while; it will make me feel less uncommitted.

    Sooooo, I've been a bit distracted from working, or even thinking, about my row. And I need to pump out two blocks for my October partner over on the Quilting Bee Block of the Month swap. But no fear ladies, dh is off to camp for a few days and I plan on spending my time between tucking the gardens to bed for winter and the sewing room :-) Yes sa! :-) Fun for me. And time to commit to locking in what my theme for the Row by Row will be.

    This wouldn't be a problem you see if there just weren't so many options :-) ;-)

    best,
    d
    If it can be taught, it can be learned.
    Mug Rug #2 Swap
    Monthly Quilting Bee Block Swap VIII- My theme is any block of kiwi greens, tangerine oranges, and a smidge of deep turquoise and dark chocolate browns.
    2012-2013 Row by Row-Groups 6 & 7 ... 2011-2012 Quilt for Quilters Swap

  3. #23
    Senior Member charlottemarie's Avatar
    Join Date
    Dec 2011
    Location
    Alabama
    Posts
    575
    Me too! Excited to start this thing.
    Life is Good!

    Visit my blog, closed the website:

    http://charlottescreationsanew.blogspot.com/

  4. #24
    Senior Member Krisb's Avatar
    Join Date
    Aug 2011
    Location
    Asheville, Tampa Bay, Lake Vermilion
    Posts
    804
    Blog Entries
    26
    Whigrose I'm with you. Need to do my Oct swap blocks, my Sept BOM PP block, sandwich, quilt and bind Princess Inas's castles. My row is just going to have to wait until after we relocate to Florida.
    I arise in the morning torn between a desire to improve the world and a desire to enjoy the world. This makes it hard to plan the day.

  5. #25
    Senior Member Whigrose's Avatar
    Join Date
    Oct 2011
    Location
    Pine cone and tassel state
    Posts
    749
    Hi everyone,
    Anyone started their row yet? Thinking about starting your row? Anyone have photos yet they are willing to share with the group?

    Our line-up is:
    Whigrose
    Krisb
    Mistymarie
    Mhobbs
    Charlottemarie

    When the time comes to mail your first row you will be sending it to the person on the list that immediately follows your name. You may either PM that person or me for the mailing address.

    When you do send off your first row, please email both the person you are sending it to and myself to let us know.

    First rows are due in the mail by Saturday, December 1.

    Thanks everyone. Have fun.

    best,
    d
    If it can be taught, it can be learned.
    Mug Rug #2 Swap
    Monthly Quilting Bee Block Swap VIII- My theme is any block of kiwi greens, tangerine oranges, and a smidge of deep turquoise and dark chocolate browns.
    2012-2013 Row by Row-Groups 6 & 7 ... 2011-2012 Quilt for Quilters Swap

  6. #26
    Senior Member charlottemarie's Avatar
    Join Date
    Dec 2011
    Location
    Alabama
    Posts
    575
    Tomorrow is my start day. I hope I can do it with no interruptions, but you know how that goes.
    Life is Good!

    Visit my blog, closed the website:

    http://charlottescreationsanew.blogspot.com/

  7. #27
    Senior Member Whigrose's Avatar
    Join Date
    Oct 2011
    Location
    Pine cone and tassel state
    Posts
    749
    Checking in on everyone to see how your rows are coming along. The deadline is December 1st- slightly more than three weeks away.

    Anyone completed their row yet? If you are and would like to send it on, pm the person after your name on the following list and ask them if they are ready to accept it or would they prefer to wait until Dec. 1

    Our line-up is:
    Whigrose
    Krisb
    Mistymarie
    Mhobbs
    Charlottemarie

    I'm working on a row right now but it will be for the group I'm in. My plans are to start my row for this group either tomorrow or Saturday.

    Kris B- would you like my row early or do you prefer to wait for the deadline?

    Remember ladies, when you send your row onward, pm the person and me. I need to know where all they rows at all times.

    Thanks and have fun.

    best,
    d
    If it can be taught, it can be learned.
    Mug Rug #2 Swap
    Monthly Quilting Bee Block Swap VIII- My theme is any block of kiwi greens, tangerine oranges, and a smidge of deep turquoise and dark chocolate browns.
    2012-2013 Row by Row-Groups 6 & 7 ... 2011-2012 Quilt for Quilters Swap

  8. #28
    Senior Member Whigrose's Avatar
    Join Date
    Oct 2011
    Location
    Pine cone and tassel state
    Posts
    749
    Hey, where is everyone? How are your rows coming? Anyone ready to mail yet?

    best,
    d
    If it can be taught, it can be learned.
    Mug Rug #2 Swap
    Monthly Quilting Bee Block Swap VIII- My theme is any block of kiwi greens, tangerine oranges, and a smidge of deep turquoise and dark chocolate browns.
    2012-2013 Row by Row-Groups 6 & 7 ... 2011-2012 Quilt for Quilters Swap

  9. #29
    Senior Member Krisb's Avatar
    Join Date
    Aug 2011
    Location
    Asheville, Tampa Bay, Lake Vermilion
    Posts
    804
    Blog Entries
    26
    Had to take a break to tile a backsplash and lay flooring in the kitchen, dining room and hallway, but that will be done by Thanksgiving and then it will be the great quilting marathon.
    I arise in the morning torn between a desire to improve the world and a desire to enjoy the world. This makes it hard to plan the day.

  10. #30
    Senior Member charlottemarie's Avatar
    Join Date
    Dec 2011
    Location
    Alabama
    Posts
    575
    Please do not send a row to me until Dec. 1. I will not be ready early, lots of company for the holidays.
    Life is Good!

    Visit my blog, closed the website:

    http://charlottescreationsanew.blogspot.com/

Page 3 of 10 FirstFirst ... 2 3 4 ... LastLast

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  

SEO by vBSEO ©2011, Crawlability, Inc.