My squares are done. I need to iron and piece. Actually I probably need to size them first. Ugh! I need an accuquilt!
|
Originally Posted by Krystyna
(Post 5107806)
My squares are done. I need to iron and piece. Actually I probably need to size them first. Ugh! I need an accuquilt!
|
Thanks Krystyna for another month of great partners! I just pm'd my partner xxmbbxx, have the top done and sandwhiched, just need to quilt and bind it! :D
|
We have a few "late arrivals" - so if you're one of them send me a PM or post here and I'll get you matched up!
|
I finished the front of the doll quilt last night, decided to do some paper piecing for fun. I got the binding cut and pressed as well. I'm going to start handquilting it this evening. It's been fun to work on so far. :-) Hope everyone is having a good time also.
|
Originally Posted by Judith1005
(Post 5107657)
I've touched base with my partner. She's almost done with hers. :shock: I have to get going on mine. I'm just undecided on fabric choice. I have had my pattern picked for a couple of weeks. I hope my partner doesn't mind if I stick to the theme. The pattern I picked will go perfect for a two color scheme.
|
quiltingcrazy and I connected over the weekend. I am done and she is almost finished so we will be mailing soon!
Thanks to Krystyna for such great match ups. |
Sulabug and I have been in contact and we are both looking forward to the April Doll Quilt Swap! Thanks so much Krystyna!
|
So many of you are going along so fast! I'm thinking that maybe starting next month we should offer double partners for those who want them. What do you think?
|
personally, i love having 2 partners! i haven't started cutting yet but i do have 20 fabrics ready to go! ladies, start your engines! i will be done closer to the middle of the month. juanitabean is very open!
|
All times are GMT -8. The time now is 03:08 PM. |