Mission 31 adult round take 2
5 Attachment(s)
I am in the quilting phase of mission 31. I am stippling the quilts and have found that depending on the size of my stipple I can get them done in 1-2 hours each so I may actually get them done by Friday! Yay! I quilted five tonight. 8 more to go! Anyways here the rest of the tops.
I posted these earlier https://www.quiltingboard.com/vbulle...d-t316418.html ok here’s five of the 9 adding last four in next post. It won’t let me add the in a reply. |
What an undertaking...great looking quilts!
|
Great quilts and well done!
|
The quilts are all lovely. Great job,
|
All your quilts are so pretty. You've done a great job.
|
What beautiful quilts. I admire you for doing so many with triangles or diamonds in them. I steer away from them myself. They are all beautiful! Well done. I also do meandering or stippling on most of my quilts, and I like that just as much as custom quilting. When I used to do quilting for others meandering was usually what they requested I do on their quilts.
|
Awesome job!!! Could you tell me the pattern name of the last quilt (the one with the black background)? Thanks for sharing...
|
Originally Posted by eibed
(Post 8526251)
Awesome job!!! Could you tell me the pattern name of the last quilt (the one with the black background)? Thanks for sharing...
|
Originally Posted by Waal
(Post 8526150)
What beautiful quilts. I admire you for doing so many with triangles or diamonds in them. I steer away from them myself. They are all beautiful! Well done. I also do meandering or stippling on most of my quilts, and I like that just as much as custom quilting. When I used to do quilting for others meandering was usually what they requested I do on their quilts.
|
They're all beautiful!
|
All times are GMT -8. The time now is 11:55 AM. |