Bonnie Hunter's 2018-19 Mystery Quilt "Good Fortune"
#612

I have made this unit w/ a foundation paper before. It is easy to draw out yourself. Draw a rectangle the unfinished size of the unit, then add the 1/4 inch seam line around all the outer edges (to the inside of the unfinished size since that will be your cut lines), then draw out your diagonal lines on each end making sure it is at a 45 degree angle and goes through the middle of the outer point.
#613

I have made this unit w/ a foundation paper before. It is easy to draw out yourself. Draw a rectangle the unfinished size of the unit, then add the 1/4 inch seam line around all the outer edges (to the inside of the unfinished size since that will be your cut lines), then draw out your diagonal lines on each end making sure it is at a 45 degree angle and goes through the middle of the outer point.
I made PP templates for the chevrons for one of the other MQs. I just drew as many as would fit full size on a page and scanned it. Then I printed it on newsprint paper. Worked great.
#614

Hope everyone had a nice holiday. I have a dumb? question...if I want to make the quilt 1/2 the size of Bonnie's, do I only make 1/2 of each clue? If I want a 1/4 size quilt, do I make 1/4 of the blocks in each clue? I am definitely mathematically challenged. I also have a head cold and can't wrap my mind around anything. I know someone will have the answers to my questions. Thanks in advance...
I love everyone's fabric choices and seeing how the clues are coming together. Luckily, I have all the colors in my stash and aside from the size of the quilt, I will stay "true" to Bonnie's color choices. Now to just find time to sew...getting apartments ready for rentals, clearing out my primary residence to sell...busy time.
Thanks again and have a very Happy 2019!
I love everyone's fabric choices and seeing how the clues are coming together. Luckily, I have all the colors in my stash and aside from the size of the quilt, I will stay "true" to Bonnie's color choices. Now to just find time to sew...getting apartments ready for rentals, clearing out my primary residence to sell...busy time.
Thanks again and have a very Happy 2019!
#616

Hope everyone had a nice holiday. I have a dumb? question...if I want to make the quilt 1/2 the size of Bonnie's, do I only make 1/2 of each clue? If I want a 1/4 size quilt, do I make 1/4 of the blocks in each clue? I am definitely mathematically challenged. I also have a head cold and can't wrap my mind around anything. I know someone will have the answers to my questions. Thanks in advance......
#617

Here are my blocks in Clue 5. Ready for #6. Sorry for the busy background. Just re-covered my large ironing board and used extra fabric from quilt backing. Kinda makes the eyes wonky, doesn’t it?
[ATTACH=CONFIG]605858[/ATTACH]
[ATTACH=CONFIG]605858[/ATTACH]
#618
Super Member
Join Date: Aug 2013
Location: Florida
Posts: 5,839

Be prepared to maybe make a few extra if you make 1/2 the blocks. Sometimes you need some to finish a block. It all depends upon how they are arranged. I wouldn't make them now, just see in the final reveal if they are needed. I made Easy Street in half and adapted the pattern to a size I liked.
#620
Super Member
Join Date: Jan 2011
Location: Cottage Grove, MN
Posts: 2,789

AlvaStitcher: Very pretty units.
Macybaby: I'm glad you can stay home during the winter storm. We had a little snow overnight and this morning it is raining. Goofy MN weather! I don't need to go out until later today and the temps are supposed to stay in the high 30's during the day so I am hoping the roads will stay ice free until I get home.
I have 20 more Chevrons to make. I need to iron, trim, or do both to some of my first 4 clues. I will start working on clue 5 later this morning.
Macybaby: I'm glad you can stay home during the winter storm. We had a little snow overnight and this morning it is raining. Goofy MN weather! I don't need to go out until later today and the temps are supposed to stay in the high 30's during the day so I am hoping the roads will stay ice free until I get home.
I have 20 more Chevrons to make. I need to iron, trim, or do both to some of my first 4 clues. I will start working on clue 5 later this morning.
Thread
Thread Starter
Forum
Replies
Last Post
AUQuilter
Links and Resources
5
06-01-2013 07:09 AM