It would take me about double that. I'd say two days, at least eight hours a day. It usually takes me a couple of hours to load it, due to measuring the top on all four sides, measuring the batting, measuring the backing on all four sides, deciding which side is the best to attach at the top, etc. I use a longarm centering tape to keep everything straight and square with each advance.