Organizing your sewing day
I am relatively new to sewing and quilting. I watched a lot of tutorials and have learned a lot! My sewing room is organized but… I have a table behind my machine as well as on both sides to extend the surface for quilting large projects and the small table on the right has my ironing station and small cutting mat for trimming. Due to space constraints the table behind the machine doubles as my cutting station and to make it a comfortable height for cutting I put two foam insulation boards under my large cutting mat. All of that has to be removed in order for quilting to be done and I put a slippery thing over the table as well. The surface to the left accumulates partially finished blocks or strips as I piece as well as cut offs so they have to be put away (or thrown to the floor!) before quilting. When I tire of quilting I have to reverse the whole organizing process which often overwhelms me to the point sometimes of avoiding the room altogether. I think I need to organize my sewing day so this doesn’t happen so my question is: Do you organize your day with quilting first and cutting/piecing next or vice versa or…?
Last edited by tanyasharon; 08-22-2021 at 09:18 AM.