View Single Post
Old 05-02-2022, 05:53 PM
  #17  
my-ty
Senior Member
 
Join Date: May 2012
Posts: 651
Default

Originally Posted by JanieW View Post
I don’t have a link so I’ll try to explain how and why I trim after sewing the binding on. I start with binding that is 2.5 inches , then folded, square the quilt by marking with a pen instead of trimming, sew the binding on with a 1/4 inch seam. When I trim I leave 1/4 inch of batting and backing by putting the ruler at 1/2inch mark on the stitching line. The purpose is to get a full binding. I don’t know how that would happen if the quilt is trimmed before the binding is sewn on. I suppose it would work with a narrower binding but I like the 2.5 inch because I can use leftover binding cut into 2.5 inch squares for scrappy quilts.
I am going to try this on my current quilt project. I usually trim first but this sounds interesting. Thanks for the instructions!
my-ty is offline