New Year Project!?
#15
Senior Member
Join Date: Nov 2008
Location: Minnesota
Posts: 862
It wasn't a single project. It was to use up all the Halloween fabric. I will have completed ONE quilt. I have 4-5 more to go. Things just didn't go well along with not feeling so good. On the plus side, I do have 2 of the other Halloween quilts 80% cut out, so I can start sewing on them very soon.
#16
wanted to make a bug jar quilt for youngest GS got it done, just finished 1st rag quilt for middle boy am waiting to wash it till I make me a rag quilt, hubby bought a 9.00 hose to connect to the washer drain will drain the water out the door and down the driveway. got the rag quilt cut out and pieced in one day snipped it the next day. Got two African quilts pieced will quilt after Christmas.
Thread
Thread Starter
Forum
Replies
Last Post
Podunk Princess
General Chit-Chat (non-quilting talk)
26
12-11-2011 03:24 AM
quilt queen
General Chit-Chat (non-quilting talk)
97
10-19-2011 04:45 PM