I've gotten a bit out of control I think.....Right now I am working on the Tonga Back To Nature BOM, Stitcher's Garden BOM and The Cotton Club BOM, plus a few other smaller projects.... I'm keeping up so far, except for the Tonga (the Y-Seams in this quilt made me crazy :) ) How many projects do you have going?
|
1 fall lapquilt ready to FMQ, a King Size ready to Quilt, a Charm Tote pieces cut and strips are sewn, need to sew them together. and a project in the closet...all sample blocks that will someday be put together.
|
3--a purse/tote, a Christmas runner, and a Christmas Snap Happy. I had to get a spool of clear thread before I made the runner so the back quilting will look nice. I have some now, so I'll probably work on it today.
|
A tube quilt to put together, a Batik quilt needing to be cut out & various projects needing to be finished or even more in my mind needing to be started.
|
Too many to count and lots more in the planning stage. :D
|
One at a time and only one! My brain will not allow more than one project however I have many "kits" waiting for me.
They are fabric that I put together along with the pattern and backing and ready to go. |
I use 2 gallon zip lock bags to bag up my fabric, pattern and thread for each project ...I have 7 bags in my tote waiting !!! a few are small wallhangings , but a few are queen size quilts. I think I have enough to last me awhile.
|
1 baby quilt and 2 full quilts to put on the frame and a miniquilt fmq on the dsm. i've had the fabric laid out for the folded dahlia, but just can't seem to get to it.
|
I have not even counted lately...there is a reason for that. :wink:
|
I can't even count them along with all my longarm quilting too.
|
All times are GMT -8. The time now is 03:13 PM. |