Table runners
#23
Junior Member
Thread Starter
Join Date: Sep 2009
Location: Plainville, MA
Posts: 114
pvquilter
Quilts in the background of the snowman table runner are ready for turning and the quilting for Project Linus. I tend to assembly line sew and always have a dozen or more in progress and in various stages going at once.
My sewing room is total chaos with stacks of pre-cut blocks, another of assembled tops, one of sandwiched quilts needing turning, another of turned and pinned awaiting the final quilting. When I fill a large trash bag with finished quilts (usually about 10) they go into my car for delivery to the Project Linus coordinator when I happen to be in her area or until I'm forced to take them to her because I have no more room in the car.
Quilts in the background of the snowman table runner are ready for turning and the quilting for Project Linus. I tend to assembly line sew and always have a dozen or more in progress and in various stages going at once.
My sewing room is total chaos with stacks of pre-cut blocks, another of assembled tops, one of sandwiched quilts needing turning, another of turned and pinned awaiting the final quilting. When I fill a large trash bag with finished quilts (usually about 10) they go into my car for delivery to the Project Linus coordinator when I happen to be in her area or until I'm forced to take them to her because I have no more room in the car.
Thread
Thread Starter
Forum
Replies
Last Post
craftybear
Links and Resources
9
09-12-2011 07:54 AM
craftybear
Links and Resources
0
09-10-2011 02:13 PM
craftybear
Links and Resources
12
08-29-2011 11:36 PM
craftybear
Links and Resources
4
06-20-2011 02:31 PM