View Single Post
Old 05-21-2008, 07:01 AM
  #9  
DA Mayer
Super Member
 
DA Mayer's Avatar
 
Join Date: May 2007
Location: Stacyville Iowa
Posts: 1,608
Default

I know I have 3 quilts tops waiting to go on the frame to be quilted and 1 on the frame. 1 snowman one that is almost done, but who wants to work on snow in the spring. 2 in the drawing planning stage. Material and fabric picked out for 3 (at least). Plus other projects that aren't quilting.
DA Mayer is offline