View Single Post
Old 06-08-2010, 05:19 PM
  #56  
mpeters1200
Super Member
 
mpeters1200's Avatar
 
Join Date: Jan 2007
Location: Omaha, NE
Posts: 1,618
Default

I put the last borders on the anniversary quilt this past weekend. This coming weekend, I'll be buying the flannel backing fabric. Then, my little stitching club is going to get together on one extra night so we can get it basted. There is no way I can get it basted by myself. Then it'll be in the frame for probably 6 months before I get it quilted...but our anniversary isn't until December, so while I'm not ahead of schedule anymore, I'm not pressed for time either.

I've got the workings of a table runner in my head....I needed to add that to the list. Coworker of mine admires my work, but she's helped me out with my resume and has been a great asset to me at work, so she's definitely deserving of a project. Then, two toddler size quilts are next for my neighbor's children. I made one for one of her kids last fall or the fall before, so now I need to make 3 more for the other kids. At least it'll be fun to make! I hope to get started on those as soon as this big one is in the frame.

I'll post pics on our pics thread as well as the Anniversary thread as soon as I get them.
mpeters1200 is offline