Old 06-12-2010, 10:22 PM
  #4  
CAROLJ
Super Member
 
CAROLJ's Avatar
 
Join Date: Feb 2010
Location: Rancho Mirage, CA
Posts: 1,855
Default

The more I work the more I have to do. I'm trying to finish up three that are in the piecing stage, and six that are tops, plus I have some odd pieces that I am thinking about making linto a sampler quilt.

When I started quilting again I swore I would finish one quilt at a time, but I was given a couple of tops, and I bought a couple. Now they are flowing like a river.

I don't know how to machine quilt a larger quilt, I can do a lap quilt, or smaller, but have never attempted anything larger. And it takes a long time to hand quilt. Plus I can't afford to have them done. Just to get a basic FMQ done is 75.00 for a queen.

Maybe I'll finish the rag baby quilt, I bought it at a yard sale, it came with a bunch of fabric.
CAROLJ is offline