Old 06-22-2010, 07:40 AM
  #3706  
athenagwis
Super Member
 
athenagwis's Avatar
 
Join Date: Feb 2010
Location: New England
Posts: 1,653
Default

Originally Posted by Tiffany
My problem is that I'm not really sticking to the week #. I printed out a bunch of the past weeks, (you know, the ones I needed to catch up on) and I've been picking and choosing from the entire pile. If I'm in the mood to applique I do those. If I just want simple piecing I do those. I'm a mess as to where I really am. I have about 25 blocks done, so I guess that puts me back around Week 6. :lol: I'm not giving up, just going slowly. And hopefully in October I'll be able to catch up on a lot of them. I've got a five day quilt retreat I'm going to and the only thing I'm taking to work on is my Confetti Jane.
Hey I'm with ya!! I only have 1 block done on one and 3 on the other LOL But I have to pick and choose because I don't have the fabric I need for all the blocks yet. :) :) I figure one of these will make a great wedding present for my son (he's 7), so as long as I am finished by then I am good to go. LOL

Rachel
athenagwis is offline