Old 08-11-2010, 01:58 AM
  #15  
raptureready
Super Member
 
raptureready's Avatar
 
Join Date: Feb 2010
Location: Illinois
Posts: 5,142
Default

I have several quilts that I'm working on right now that have to be done by Dec. 1. Yesterday I caught up on my Buck-a-block Thangles club by making the last 5 blocks, did my BOM for this Saturday, and make the remaining 5 blocks for GGD's quilt that each block had 8 Y seams. I've got 5 more to go on the other GGD's quilt and then those two, a couch throw for my brother and a quilt for a grandson to do. I'm hoping to have most of them done by the end of September. Plus I'm also hoping to have two other BOM's that I'm working on (but I'm months behind) done by then. I'm going to a retreat at Threads of Time in Danville, Il. the last week of Sept. so I should be able to get a lot done there. ANYONE CARE TO JOIN ME?
raptureready is offline