View Single Post
Old 10-26-2010, 09:48 AM
  #15  
craftiladi
Super Member
 
Join Date: Nov 2006
Location: las vegas nv.
Posts: 2,452
Default

Originally Posted by Ditter43
In 2006 my DH had a temporary job that kept him on the road a lot. The job lasted about 3 months. The day I took him to the airport, I came home and started tearing out walls and a dropped ceiling. It was hard physical work but I enjoyed knowing the change at the end would be worth it. This is the result. You can't see the whole kitchen in this picture.
WOW!!!!
Oh your kitchen is the same lay out as mine w/ the exception of the frig. I have been very torn how to remodel it. If I were to place my frig where yours is I cut down the large entry way into my family rm and have to move the plumbing...love the job you did, not sure I would be brave enough to tackle that by myself.
craftiladi is offline