View Single Post
Old 11-07-2010, 04:40 PM
  #99  
MaryAnna
Super Member
 
MaryAnna's Avatar
 
Join Date: Oct 2009
Location: South Carolina
Posts: 1,924
Default

Originally Posted by sosewcrazy
In progress:
- 3 lap quilts with embroidered snowman toile (12 blocks total). Embroidery is finished for 2 of them, plus 3 squares started on the third.
- bright half log cabin quilt for my daughter.
Yet to begin:
- 2 Steelers strip quilts
- puzzle quilt for friend with autistic son
- Pokey Little Puppy lap quilt for my Dad, who read that story over and over and over to me when I was little, and still teases me about it!
- scrap bag / pin cushions (2)
- 2 flannel snowman raggy quilts
Think I'll be ready by Christmas?
Only if you don't have to sleep at night, nor work a job during the day. then you might be able to get it done by Christmas!
Blessings,
MaryAnna
MaryAnna is offline