View Single Post
Old 12-01-2010, 08:31 PM
  #55  
Kyiav10
Super Member
 
Kyiav10's Avatar
 
Join Date: Sep 2007
Location: Williamsport Pennsylvania
Posts: 3,361
Default

I am amazed that you have completed 15 tops in less than a year. Congratulations. This year maybe you can dedicate to finishing UFO's. I will be brave and list my UFO's so you aren't the only one.

1. Second Floral Quilt (It will be very much like the one I gave to my mother)

2. Blue baby quilt (sandwiched - ready to quilt)

3. Bargello (partly pieced) pic here http://www.quiltingboard.com/t-64579-1.htm

4. Star Struck (currently quilting by hand - probably measures queen size)

5. log cabin (sandwiched - trying to work out a design for quilting) pic here http://www.quiltingboard.com/t-12172-1.htm

6. 4th of July (top - just waiting in line)

7. Butterfly quilt (binding only left to finish)

8. left over butterfly blocks to put into another baby quilt

9. OBW (sandwhiched - will be next one quilted)

10. 2nd OBW (piecing project)

11. Pin Wheel (have to cut the HST's and make into blocks)

12. Warm Wishes (yet another piecing project)

13. fall blocks (from swap - still haven't decided what to do with them)

I dedicated most of 2010 to getting tops done. I finished 5 and will have one more done by the end of the year.

I plan on 2011 getting some tops done to have ready to quilt 2012 to join the UFO challenge again on yahoo groups.

Kyia
Kyiav10 is offline