Okay...all nine stockings are cut and pinned. They need to be sewn and then clipped so I can wash them to fray the edges. Unfortunately right now the bathroom right outside my studio is blocked by construction crap and my stepdad Wes is laying our oak hardwood floors right now so half of the upstairs is not able to be walked on. He has half of it done and that is incredible since he is doing it by himself!
It is so freaking noisy here with the air compressors going off and all the nailing that is being done with this enormous neumatic nail gun. Good grief!
My brother in law and his buddy are the ones remodeling the bathroom and they just carried our new vanity top/sink in. It is the most amazing looking since I have ever seen. It is all glass. Soo wild looking. It really should be a cool thing when it is finished.
Well...I am getting more and more tired so I am going to end this and pray for the noise and the commotion to end...*sigh*
Missy
Here is a picture of the vanity from the manufacturer
[ATTACH=CONFIG]141827[/ATTACH]