View Single Post
Old 01-09-2009, 08:44 AM
  #31  
GailG
Super Member
 
GailG's Avatar
 
Join Date: May 2008
Location: Louisiana
Posts: 6,764
Default

Originally Posted by Barbm
funny Gail :) I will do my best to stick to that goal!

I made a list of projects for the year. I have 11 "Must do", 2 "if I have to", 5 wips- stuff I cut out but didn't like so I set aside, this includes the 2 I am working on right now- can that be classified as UFO?, hmmmm. Then I have the list of 5- "whenever, they haven't asked lately" projects I have the fabric for but haven't started.

It's supposed to snow tomorrow- 3 to 6 inches. I figure I can finish the 2 I'm working on and sandwich and quilt 2 wips. That will make a lot of stuff crossed off the list. Cool.

My goal is to FINISH this list by March. A lot of them I know I can do easily, but need to find the time. (Gosh- I certainly hope people stop having babies, too- that messes up the project list- j/k)
I know what you mean. I don't write down the list of UFOs etc. because I don't want to have a nervous breakdown SEEING what I have ahead of me. This morning, I'm handstitching the last binding on my 8-yr-old UFO. It's a great feeling. As we Cajuns say, "Talk about gooooood."
GailG is offline