Old 03-01-2011, 09:52 AM
  #1  
BellaBoo
Power Poster
 
BellaBoo's Avatar
 
Join Date: Jan 2009
Location: Front row
Posts: 14,646
Default

I went to a LA's home for hands on instruction to load and quilt a quilt. It took almost two hours to get the quilt, batting and backing loaded on the machine. The quilter has been doing this for years and does good LA quilting but to go through all that for each quilt? I was bored and tired of it before I got to the stitching part. :? After going through that I am re thinking the OH I want one.
BellaBoo is offline