Old 03-01-2011, 10:09 AM
  #8  
MaryStoaks
Super Member
 
Join Date: Dec 2008
Location: La Quinta, CA
Posts: 3,918
Default

It takes me less, 20 to 30 minutes. I float the top and batting, just lay them on the backing after the backing is loaded and rolled on the frame poles/leaders. I use a few pins to keep the top and batting straight on the backing, then sew around the edges to attach it. I do have to take a minute to straighten the top and batting with each advance of the quilt. :thumbup: :thumbup:
MaryStoaks is offline