View Single Post
Old 03-01-2011, 12:38 PM
  #1  
MommaDorian
Super Member
 
MommaDorian's Avatar
 
Join Date: Aug 2010
Location: Sully, Iowa
Posts: 2,390
Default

I took my maching to my LQS for service. It's been too long. I'm having trouble with the bobbin tension, I figured it was time. He can have it done in 1 1/2 hours, but that's a long time to wait in a pretty small town. So, I'm without until tomorrow. Whatever will I do? lol I'm actually going to cut out a Bow Tuck that I'm going to make bigger for a diaper bag.
MommaDorian is offline