View Single Post
Old 03-01-2011, 12:41 PM
  #2  
wolph33
Super Member
 
wolph33's Avatar
 
Join Date: Jul 2010
Location: Wi
Posts: 9,232
Default

Originally Posted by MommaDorian
I took my maching to my LQS for service. It's been too long. I'm having trouble with the bobbin tension, I figured it was time. He can have it done in 1 1/2 hours, but that's a long time to wait in a pretty small town. So, I'm without until tomorrow. Whatever will I do? lol I'm actually going to cut out a Bow Tuck that I'm going to make bigger for a diaper bag.
a day is not bad mine took 10 days-but at least I have backup
wolph33 is offline