View Single Post
Old 01-25-2009, 11:16 AM
  #19  
c2cd2008
Senior Member
 
Join Date: Apr 2008
Posts: 323
Default

The pattern perfect is now installed onto the frame. Because we do not have the carriage upgrade we had to modify the carriage a little bit, which was not a huge problem because it is wood it was easier to drill holes into.

First we had to remove the machine from the carriage and turn it on its side to drill two holes for the stylus to be mounted into.
[IMG]http://img.photobucket.com/albums/v3.../Justin160.jpg[/IMG]

We drilled two holes into the very back of the carriage.
[IMG]http://img.photobucket.com/albums/v3.../Justin161.jpg[/IMG]

In this picture you can see the stylus has been bolted on.
[IMG]http://img.photobucket.com/albums/v3.../Justin166.jpg[/IMG]

This is a cloder view of the stylus
[IMG]http://img.photobucket.com/albums/v3.../Justin164.jpg[/IMG]

The pattern perfect is laid out and are snapped together with plastic pins at the top and bottom of each frame. Then bolted on to the frame to keep them from moving as the carriage moves inside the grooves of the pattern.
[IMG]http://img.photobucket.com/albums/v3.../Justin165.jpg[/IMG]
c2cd2008 is offline