1. Kids quilt for Feb. done. Started in 2004?
Cut and pieced another one from leftovers.
2. BOM blocks won at local guild in Oct. 2009 pieced into a top. Needs to have backing pieced and then layered and quilted.
3. Eleanor Burns Summer Porch. Had a few blocks cut. Finished piecing the top. Needs layered and quilted.
4. School bags for missions. So far this year completed 29 bags. Six more are partially done and I cut 8 more today.
My goal for the year is 100.
5. Need to machine stitch binding to 3 mission quilts, but heavy duty machine in for repairs.
Kid's quilt for Feb
[ATTACH=CONFIG]178061[/ATTACH]
BOM in BQ setting
[ATTACH=CONFIG]178062[/ATTACH]
Summer Porch
[ATTACH=CONFIG]178063[/ATTACH]
29 LWR School Bags
[ATTACH=CONFIG]178064[/ATTACH]