Anyone have any stories to tell to make me feel a little better????
We are in the middle of having bath vinyl flooring replaced. The installer came at nearly 11 yesterday and left at 7 without finishing as they didn't order enough vinyl.
The powder room toilet is working but the sink is full of his stuff. Bolts need cut and caps on is all. Job is just OK, I can see a couple spots that barely pass muster.
The guest bath toilet got reset, leaked, got tightened and now has NO water. This is the bath we must shower in and use sink.
Master bath has toilet sitting in the shower, too small piece of vinyl laying there, all his equip (air compressor, tools, trash) in there and scales, towel basket, rugs, etc in our bedroom floor.
Designer just called apologizing and saying the order was expedited and vinyl will be in tomorrow. I told her she would need to do something to make this right with us. She told me that she WAS by expediting shipping. That ain't gonna fly!!!
Seriously thinking of calling CC company to dispute the charge at this point.
GRRRRRR