Old 05-17-2011, 09:08 PM
  #3  
greensleeves
Super Member
 
Join Date: Aug 2010
Location: Roswell, NM
Posts: 1,727
Default

Pin a finished edge to the takeup/back leader. Pin the backing of the unfinished edge to the front/top leader and then you can adjust the batting and top as you continue to quilt. Pin a little beyond (toward the front) where you will be stitching through all three layer to help stabilize if you want. Otherwise just let the batting and top "float". In this situation you will not be using the leader that you would normally pin your backing to. Hope this helps.
greensleeves is offline