Old 06-05-2011, 06:25 PM
  #52  
MargeD
Power Poster
 
Join Date: Feb 2011
Location: Lowell, MA
Posts: 14,083
Default

Yup, I agree it's a small thing, but small things can be frustrating and I feel your pain. I'm working on a family reunion quilt that absolutely, positively has to be finished, quilted and sent to Crete, NE before June 20. Wish me luck. I just spent about 3/4 of an hour "unsewing" some of the blocks because I put them in upside down and backwards. It's after 10PM, I'm tired, so I put the blocks away until tomorrow. Why, oh why did I have to pick a 25-patch block? Oh, I remember, the block is "Sister's Choice" aqnd I'm making it in memory of my only sister who passed away 2 months after the last family reunion 2 years ago. I'm glad now that she insisted that I go with her, despite 2 1/2 days each way. I'm hoping that by making the quilt I can work through missing my best friend. I did, however, get a twin-size quilt top done for her great-granddaughter that we were going to work on together. Thank God for quilting, it's my passion, my stress reliever, etc., erc. Tomorrow's another day, and I'm sure I'll miess up at least one more block before I'm done. Hang in there.
MargeD is offline