View Single Post
Old 06-10-2011, 11:36 PM
  #366  
Kyiav10
Super Member
 
Kyiav10's Avatar
 
Join Date: Sep 2007
Location: Williamsport Pennsylvania
Posts: 3,361
Default

Originally Posted by Kyiav10
I am planning on not buying too much fabric this year. I would like to only work on my ongoing projects.

I have a few tops, some already sandwhiched, to be quilted. I also have some piecing projects.

I want to focus on some projects this year and not purchase.

Here is my list.

1. Star Struck (currently quilting)
2. 4th of July (top)
3. OBW (sandwhiched ready to quilt)
4. Log Cabin (top)
5. Blue block quilt (sandwhiched ready to quilt)
6. Floral Quilt (blocks)
7. Bargello (partly pieced)
8. Pin Wheel (HST's done)
9. Fall blocks (from swap)
10. Butterfly blocks (leftover from other quilt)
11. Warm Wishes (piecing project)
12. OBW 2 (piecing project)
13. Diagonal Strip quilt (only have fabric bought)
14. String Quilt (piecing project)
15. Breast Cancer blocks (from swap)

Numbers 1, 14, 13, 3 are my plans for this year. My sister also requested a baby quilt that I think I will use number 6 for.

Kyia
Ok... I am almost done quilting #1. The binding is ready to go as soon as the quilting is done. Hope to have it done before July.

Started quilting #3. I am doind a meandering stitch by hand. Really excited about it.

I used up some of the left over #6 for two baby quilts. Enough left for a small wall hanging that I will whip up for a donation quilt.

Not as far on #14 that I would like to be. Have to work on it more on my days off.

Hope all are doing well with their goals!

Kyia
Kyiav10 is offline