The year I did this, I was working on 2 quilt tops at the same time and got them both done in 5 weeks. That is only working on themafter work (5pm) till about 10pm each night about 5 nights a week. So I don't see why it couldn't be done in even less time. Pretty easy directions as are always the way with Eleanor Burns. and I did the super King size with added length to go over pillows.
Lovers knot
[ATTACH=CONFIG]229716[/ATTACH]