Thread: My WIP list
View Single Post
Old 06-04-2009, 03:58 AM
  #4  
k_jupiter
Senior Member
 
k_jupiter's Avatar
 
Join Date: Dec 2006
Location: Bay area CA
Posts: 887
Default

Hmmm. done with the baby quilt. needs mailing.

1.) Wedding quilt (Double Irish Chain)(twin) needs to be done by October (one year you know)
2.) Amelia's Entwined Quilt (full) needs done by February 2010.
3.) Put the long poles on the new Tin Lizzy 18 frame so I can quilt my QS tops.
4.) Unpin YBR (QS) so I can roll it on the frame.
5.) Homeward bound (QS), top done, needs quilting.
6.) SouthWest Medallion (QS) quilt top in progress, 1/3 done
7.) Sunshine and Shadow (QS) top about 1/2 done.
8.) Couple of Tim's Tims Convergence quilts, fabric bought, not cut yet.
9.) Latilla quilt (QS) fabric bought, ironed, not cut.
...

tim in san jose
k_jupiter is offline