Old 08-20-2011, 10:07 AM
  #9  
Gramie bj
Super Member
 
Gramie bj's Avatar
 
Join Date: Dec 2010
Location: Riverside Washington
Posts: 1,508
Default

hopefully will finish last 6 blocks for block swap, clean up sewing room, start, again, on a paper pieced UFO, only need about 1 hr work then maybe start working on my next quilt design, tone on tone in nuturals hope it works. Oh ya I almost forgot have to load a backing on the long arm. Top already on it , when I went to piece the back discovered I used part of it for another project so needed to rethink my back. need to have that quilt done in two weeks. so after blocks will load it and start the quilting.
Gramie bj is offline