I need to revise my WIP list.
in progress:
--wallhanging, baby gift, don't have time to make 2 quilts for twins------PRIORITY #1
--BOM Pioneer..here.. so far, I'm still keeping up
--lapquilt for Mom; she's still using a cheap store one--Christmas or birthday
--lapquilt for me; I don't have one. First block made.
not started yet:
--wallhanging, daughter's 30th BD-Sept, landscape, no design yet-- after baby quilt--PRIORITY #2
--learning kaleidoscope technique; selected fabrics, must postpone
--sampler lapquilt of the BOM, for disabled friend--after Dec BOM
Except for multiple smaller projects at Christmas, this is the most WIPs I've ever had going at the same time.