Well things are looking up! It was 6 projects not 5 and I got 3 done and a good start on the 4th! On top of that DH got the main bathroom gutted and I happyly help load the old bathtub onto the truck. So tomorrow we will have a trip to the dump and I should be able to get 2 more jobs done and then start on the custom sewing job. LOL I will be going back to work on Monday to get a rest!