Old 07-21-2009, 08:13 AM
  #29  
mytwopals
Super Member
 
Join Date: Apr 2009
Posts: 3,382
Default

Heck, it took me 3 hours to iron and load 3 yards of 108" backing fabric onto the quilting frame just last night. I still need to load the top and batting and then quilt it. No stress, I have until Saturday to quilt and bind it. :-o
mytwopals is offline