Originally Posted by kwhite
I have sewed the clothes I was wearing to the project.
:lol:
I'm sorry.... but I laughed so hard coke nearly came out my nose when I read this! LOL
I can imagine how embarassing that would be!
My worst (so far) is sewing a pile of about 30 or 40 hst, chain piecing, one after the other, the whole lot of them, then discovering the bobbin ran out halfway down the first one.