I have four quilt tops ready to be quilted - will end up tying them just to get them done in time for winter. Two other tops I am working on quilting right now (by hand) and another baby blanket need to finish by October. Good thing I'm done with work in 2.5 weeks!! I HOPE to have enough fabric in stock to do the baby quilt as my income will be drastically reduced once I leave my job. I have plenty in stock for my stack of inspiration magazines, flyers, books I keep looking throuhg and saying, "Oh, yeah, I DO have to do that one too... and that one... and that one..." You get my drift...