View Single Post
Old 01-02-2012, 08:44 AM
  #32  
bcross
Junior Member
 
Join Date: Nov 2010
Location: Mississippi
Posts: 109
Default

1. Complete my Michael Miller BOM this year (2012) that will be starting next month without falling behind.
2. Finish my 2011 Michael Miller quilt (ready to go on the longarm) and start the matching bedskirt and finish the 2 pillow shams.
3. Teach a monthly Sylvia's Bridal Sampler and complete 80 blocks.
4. Learn to foundation piece.
5. Finish my cousin's Turning Twenty quilt (cut out ready to piece).
6. Complete a queen size Turning Twenty quilt for my DS and DDIL.
7. Become active in the quilting quilt I joined. (It is in Little Rock, AR a 3 hr drive from me. They have a lot of outside speakers and some workshops I want to take.)
8. Have fun!
bcross is offline