Default Craft/Sewing Room: Update # 3 (Framing)

Hi:

Below are pictures of the work that took place today - getting the framing for the room completed. These pictures are an update to my previous posts on this room build:

Update # 2: http://www.quiltingboard.com/mission...a-t174280.html

First Post: http://www.quiltingboard.com/mission...s-t170083.html

[ATTACH=CONFIG]301686[/ATTACH]
The wall between the laundry room and the new space. Washer and dryer are moving over to the right of the laundry tub.
[ATTACH=CONFIG]301687[/ATTACH]
New door opening between the laundry/storage room and the new space.
[ATTACH=CONFIG]301688[/ATTACH]
Wall that will have the cut-out to the existing family room.
[ATTACH=CONFIG]301689[/ATTACH]
This is the wall, beside the opening for the new door to the laundy/stroage room, that will have a closet. You can see the footprint of the closet on the floor. There will be an opening of 48" with bi-fold doors. The angled part will have corner shelving.

I'm excited to finally see this started! More to follow as work continues.