View Single Post
Old 01-11-2012, 10:35 AM
  #32  
caspharm
Super Member
 
caspharm's Avatar
 
Join Date: Jan 2011
Location: Nevada
Posts: 6,958
Default

I know the feeling. We had so much going on last year: moving to a new home[actually Dec 2010] with some work on the house, a room addition, setting up a real quilting studio area, a couple of trips -including visiting our son in Spain, and a BOM from the LQS near our new home (signed up for both versions and still need to finish 7 blocks for that), that I only finished two small projects (baby quilt for a friend' new grandchild) and a late retirement gift for a friend of my DH (it was due in Oct, but sent in Dec).

I am starting to get energized. I just finished two tops from a block swap at guild as well as the guild BOM we started in Nov (guild skipped Dec). I still have a stack of UFOs from when I was working full time (just retired before moving) that I want to finish, including some BOMs and shop hop quilts.
caspharm is offline