Old 03-02-2012, 04:37 AM
  #34  
QuiltE
Power Poster
 
Join Date: Apr 2011
Location: Ontario, Canada
Posts: 17,721
Default

Even though I'm not caught up .. I'm OK with the 2 per week. Once I got my FWS blocks done a month ago, I've been able to stick with the posse for the current week, and have even managed the odd block from the previous week, as I've worked on the FWS sashing. I'm hoping for a good go again, this weekend on that front! Once the FWS if off to the LAQ, then I'll catch up on the missing PC blocks. Though I think there's only 5 I haven't done, so it's not too discouraging.

ITA with DublB that if we slow the pace down, it may seem like it's taking forever ... and there's the danger of losing interest if we're dragging along. And too, for those who are ahead of the group, I wouldn't want to slow the pace and have them lose interest.

I am SO enjoying this journey ... and still envious of those who did the FWS together!!!
QuiltE is offline