View Single Post
Old 04-29-2012, 04:00 PM
  #1040  
wildyard
Super Member
 
wildyard's Avatar
 
Join Date: Mar 2010
Location: Upstate NY, north of Syracuse Area
Posts: 6,003
Default

You all are simply amazing with so many finishes. Instead of finishes, I have 3 more starts! What is wrong with that picture? I am going backwards here. Guess my one finish for April is going to be it and I am going to have to get my behind in gear for May! I have 3 must dos for May; the pink ribbon, the beach comfort quilt and the wedding calendar quilt. Sadly, only the wedding quilt is a UFO. LOL. The pink ribbon is only a procrastination. I have 9 of the 12 calendar blocks done so far. Today I designed and started cutting squares for the beach comfort quilt. I'm excited about the design I came up with.

Last edited by wildyard; 04-29-2012 at 04:03 PM.
wildyard is offline