View Single Post
Old 04-29-2012, 04:32 PM
  #1041  
oksewglad
Power Poster
 
Join Date: Jul 2009
Location: Between the dashes of a tombstone
Posts: 12,716
Default

Originally Posted by wildyard View Post
You all are simply amazing with so many finishes. Instead of finishes, I have 3 more starts! What is wrong with that picture? I am going backwards here. Guess my one finish for April is going to be it and I am going to have to get my behind in gear for May! I have 3 must dos for May; the pink ribbon, the beach comfort quilt and the wedding calendar quilt. Sadly, only the wedding quilt is a UFO. LOL. The pink ribbon is only a procrastination. I have 9 of the 12 calendar blocks done so far. Today I designed and started cutting squares for the beach comfort quilt. I'm excited about the design I came up with.
We must be cut from the same cloth
oksewglad is offline