Old 06-24-2012, 01:51 PM
  #94  
Beth33
Senior Member
 
Join Date: Mar 2010
Location: Buffalo, N.Y.
Posts: 383
Default

Jelly roll strips are dry, pressed, and hanging (very carefully) over my bedroom door. I'm thinking I could finish that top in two nights this week. Yah!!

Still have to do a schoolhouse block for September. Saw the fabric wasn't prewashed/shrunk, don't want to do a special load today. I finished the football pillowcase, so that project all packed away for now. The jelly roll and D9P projects don't need to be finished until next August (2013).

I will be finished with college at the end of July, moving into an apartment where I'll have a sewing room, and have already bought a Ken Lund quilt frame, can't wait to set it up. Will be too busy with finals to join you all next month, see you in August, tho!
Beth33 is offline