Old 06-24-2012, 05:52 PM
  #127  
gramajo
Super Member
 
Join Date: Mar 2011
Location: Peotone IL
Posts: 2,802
Default

I finished 6 of the 10 head blocks for my Silhouettes quilt. It all took longer than I anticipated--cutting out the fused black heads seemed to take forever. Hopefully I'll be able to get one done each day before I have to work. Sooo, next Sat. I'll be able to start on the sashing. Even though I didn't get them all done, I still made good progress, so I'm happy.

I needed Virtual Quilt Day so I didn't feel guilty not doing something that needed to be done.

Gonna read the Sun. paper & then to bed. I'm tired.

Keep on posting all your projects. We love seeing them.
gramajo is offline