View Single Post
Old 09-15-2012, 08:52 AM
  #34  
Neesie
Super Member
 
Join Date: Mar 2012
Location: Texas, USA
Posts: 5,896
Default

I have one last lap quilt, to which I'm adding two rows (it's too short), then sandwich, quilt, and bind. While the glue sandwich-basting is drying (even after ironing), I'll be working on some dog beds, for a friend. Then back to the lap quilt, to quilt and bind. Then back to dog beds. I keep having to throw in breaks, for eating and checking QB!
Neesie is offline